Industrial Construction & EPC EHS & Safety Management Software

One connected platform for project safety, high-risk work, incidents, permits, and verified corrective actions.

Connect EHS information across construction, installation, testing, commissioning, and start-up. Dexur helps project teams link incidents, inspections, permits, work packages, contractor activities, and corrective actions from individual work fronts to enterprise oversight.

Request an Industrial Construction & EPC EHS Demo   →

From work-front report to verified closure

Connect Industrial EPC Safety From the First Finding to Verified Closure

Industrial EPC risks change as construction advances, systems are energized, and multiple contractors work simultaneously.

Separate permit records, inspections, incident logs, and action trackers can obscure unresolved hazards and responsibilities.

Dexur connects each finding to its project, area, work package, contractor, investigation, control, responsible owner, and field verification.

  1. Identify

    Report a site hazard, incident, high-potential event, or inspection finding.

  2. Investigate

    Connect the event to its area, contractor, equipment, and contributing factors.

  3. Prioritize

    Assess high-risk work, permits, JSA/JHA controls, and potential consequences.

  4. Assign

    Set an EPC, construction, engineering, contractor, or EHS owner and due date.

  5. Correct

    Track field controls and corrective actions with supporting evidence.

  6. Verify

    Confirm controls in the field before closure and trend review.

One connected platform

Manage Industrial Construction & EPC EHS in One Platform

01 / INCIDENTS

Project Incidents & Near Misses

Connect events to the work front and responsible team.

Capture falls, dropped objects, lifting events, equipment incidents, electrical events, releases, and high-potential near misses. Link each record to its project, work package, contractor, and corrective action.

  • Record immediate controls, affected activity, equipment, and evidence.
  • Connect investigations to root causes and accountable owners.
  • Review recurring events by project, contractor, area, and activity.
02 / INSPECTIONS

Site Inspections & Hazard Management

Turn work-front findings into verified action.

Track cranes, rigging, scaffolds, excavations, temporary power, confined spaces, hot-work areas, and commissioning systems with a common finding-to-closure workflow.

  • Connect findings to equipment, system, work area, and risk priority.
  • Track assigned actions, due dates, and field verification.
  • Identify repeated hazards across work packages and project phases.
03 / COMPLIANCE

Permits, JSA/JHA & EHS Records

Keep high-risk work controls and evidence connected.

Organize permit-to-work, JSA/JHA, isolation, gas testing, inspection, training, and audit records by project and activity. Map applicable requirements to the relevant jurisdiction and client standards.

  • Link permit deviations and findings to responsible owners.
  • Keep contractor, equipment, and activity records traceable.
  • Maintain documented action and verification histories.
04 / ACTIONS

Corrective & Preventive Actions

Manage every finding through field verification.

Connect actions arising from incidents, permits, inspections, audits, lifting operations, work-at-height findings, and commissioning readiness reviews.

  • Assign EPC, engineering, construction, contractor, or EHS owners.
  • Track overdue and high-priority actions by project and work front.
  • Verify effectiveness and monitor repeat findings.
05 / HIGH-RISK WORK

High-Risk Work & SIMOPS

See where activities and controls intersect.

Connect lifting, work at height, confined-space entry, excavation, hot work, electrical isolation, and simultaneous operations to their locations, permits, and required controls.

  • Review conflicting work fronts and construction/commissioning interfaces.
  • Track critical-lift, entry, isolation, and hot-work findings.
  • Connect control deviations to corrective actions and verification.
06 / COMMISSIONING

Commissioning & Process Safety

Carry safety records through start-up and handover.

Track energization, pressure testing, temporary systems, system turnover, process hazards, safeguard findings, and outstanding safety actions as construction transitions into operation.

  • Link findings to systems, equipment, and project phase.
  • Review readiness, safeguards, and outstanding high-risk actions.
  • Keep verification evidence connected through handover.

See patterns across projects and work fronts

See Where Risk Is Concentrating Across Industrial EPC Projects

Recurring lifting findings, dropped-object events, permit deviations, and isolation concerns may span multiple contractors, areas, and shifts.

Dexur connects incidents, inspections, permit and JSA/JHA findings, high-risk work observations, and corrective-action histories so EHS teams can review trends by project, work package, contractor, equipment, and project phase.

Find Answers to Industrial EPC Safety Questions

  • Which projects or work fronts have repeated high-potential events or unresolved hazards?
  • Where are lifting, rigging, and dropped-object findings recurring?
  • Which work-at-height, confined-space, excavation, or hot-work controls need follow-up?
  • Where do permit, JSA/JHA, isolation, or SIMOPS deviations persist?
  • Which contractors or work packages have overdue high-risk corrective actions?
  • Are commissioning or process-safety findings still open before handover?
  • Which risks reappear after actions have been verified and closed?

Measure follow-through on project safety

Track the Activities Behind Industrial EPC EHS Performance

Review both incident indicators and the controls behind them: inspections, high-risk work findings, contractor follow-up, corrective-action closure, and readiness through commissioning.

KPI What It Helps You Monitor
High-Potential Incident Rate Incidents and near misses with credible potential for severe consequences, reviewed by project and work activity.
Safety Inspection Completion Rate Completion of planned site, equipment, work-area, and contractor inspections.
Permit-to-Work Deviation Rate Recorded deviations in permit-controlled work and associated field controls.
High-Risk Work Findings Lifting, work-at-height, confined-space, excavation, hot-work, and electrical/isolation findings.
On-Time Corrective Action Closure Actions completed and field-verified within the defined timeframe, including contractor-owned actions.
Overdue High-Risk Actions Priority actions still open after their due dates, by project, contractor, work package, or system.
Repeat & Commissioning Findings Recurring site findings and unresolved pre-commissioning, commissioning, or handover safety issues.

Review these indicators alongside workforce exposure, project phase, contractor activity, and reporting participation. Rates depend on the organization's defined classification and denominator methodology.

Every project. Every work front. One connected view.

Real-Time EHS Visibility Across Industrial EPC Projects

Connect safety information from enterprise and project oversight to site areas, systems, equipment, contractors, and work packages. Give each role visibility into the findings and actions it owns.

Corporate EHS Leaders

Compare high-potential events, inspection performance, contractor findings, and overdue high-risk actions across projects and regions. Drill down to the activity, event, and responsible owner behind each trend.

Project EHS Managers

Review incidents, permit and JSA/JHA findings, lifting and work-at-height risks, SIMOPS interfaces, and commissioning concerns. Prioritize and verify actions across contractors and work fronts.

Construction & Work-Front Supervisors

See current hazards, permit deviations, inspection findings, and assigned actions for their areas, systems, crews, and activities. Track controls and deadlines through shift and phase handovers.

Organization

  1. Enterprise / Client
  2. Region
  3. Project

Operations

  1. Site / Area / Unit
  2. System / Equipment
  3. Contractor / Work Package

Follow-Through

  1. Incident / Permit / Inspection Finding
  2. Responsible Owner
  3. Corrective Action
  4. Field Verification

Industrial EPC EHS visibility

One Event. One Connected Record. One View of Industrial EPC EHS Risk.

From the first project-site hazard to final field verification, Dexur keeps the safety history connected across projects, work packages, contractors, and commissioning phases.

Project Context

Connect each finding to the site, area, system, equipment, and work activity.

Verified Corrective Actions

Track ownership, deadlines, field evidence, and effectiveness before closure.

Cross-Project Visibility

Compare recurring risks and open findings across contractors and projects.

Enterprise Reporting

Move from project KPIs to the events and actions driving the result.